Are you OK with cookies?

We use small files called ‘cookies’ on hmiprisons.justiceinspectorates.gov.uk. Some are essential to make the site work, some help us to understand how we can improve your experience, and some are set by third parties. You can choose to turn off the non-essential cookies. Which cookies are you happy for us to use?

Skip to content

HMYOI Feltham A

Published:
Open document

Report on an unannounced inspection of HMYOI Feltham A by HM Chief Inspector of Prisons (4 -14 March 2024).

Feltham A healthy prison scores

Bar graph showing HMYOI Feltham A's healthy establishment outcomes for 2022 and 2024. Safety dropped from reasonably good to poor, both care and resettlement remained the same at reasonably good, and purposeful activity dropped from not sufficiently good to poor.

What we found

Conditions at Feltham A, a young offender institution in London, had deteriorated significantly since its last inspection, and was characterised by rising self-harm and very high levels of violence. Incidents of disorder had tripled since the last inspection and the use of force, usually in response to violence, had risen by 68%. The situation was so volatile that some children said they did not want their families to visit in case violence broke out in front of them.

In the summer of 2023, things had got particularly bad, with a dramatic increase in the number of assaults and a serious incident in the education block that led to its closure from 22 August until early September. Inspectors found ongoing concerns about children’s access to education, with the use of 266 keep-apart instructions. This meant that, rather than being placed in lessons with children who had similar abilities and interests, boys were allocated to classes based on whom they could mix without fighting.

Another major concern was the worryingly prolonged segregation of some children from their peers. Seven children had been separated for more than 50 days, two of them for more than 100.


Please note a survey finding in this report was updated on 2 August 2024.


Action plan